Spring Solar in Provo
11+ yrs
Experience
80 km
Service radius
1-10
Employees
Profile information
About Spring Solar
Family-owned Utah solar installer with direct-access customer service and expert residential installations
Provo, Utah 84065
Provo, Utah 84065
Services Offered
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
25yr
Inverter Warranty
10yr
Installation Warranty
Questions to Ask About Installation
Initial Consultation
Ask whether a site assessment is offered, what it covers, and whether it has a fee.
System Design
Request a design showing the proposed equipment, layout, assumptions, and itemized costs.
Permitting & Approval
Confirm who handles permits, inspections, and utility interconnection, and which fees are included.
Installation
Verify the installation team’s licenses, relevant certifications, and insurance.
Commissioning & Handover
Confirm the testing records, monitoring access, warranty registration, and support included in the handover.
Service Areas
Customer Reviews
No reviews yet. Be the first to review Spring Solar!
Frequently Asked Questions
How do I get a quote from Spring Solar?
You can request a quote through the form on this page or contact Spring Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does Spring Solar serve?
Spring Solar is based in Provo and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does Spring Solar hold?
This profile does not list independently verified certifications. Ask Spring Solar for current license, insurance, and credential details, then confirm them with the relevant authority.
What warranty does Spring Solar offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Spring Solar for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask Spring Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does Spring Solar handle permits and paperwork?
The exact scope is not verified on this profile. Ask Spring Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Business Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Request a Quote from Spring Solar
Send your project details to request follow-up from Spring Solar. Response timing and consultation terms are set by the company.
For Spring Solar
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
Spring Solar