S

Spotlight Electric in Cleveland

Cleveland, Ohio·Solar Installation
ResidentialCommercialIndustrial

16+ yrs

Experience

80 km

Service radius

1-10

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Spotlight Electric

Cleveland-area licensed electrician and solar installer since 2010 — residential, commercial, and industrial electrical services

Cleveland, Ohio 44116

Cleveland, Ohio 44116

Services Offered

Solar InstallationEV ChargingMaintenance

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

BBB AccreditedLicensed Electrician

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Cleveland, OhioRocky River, OhioLakewood, OhioWestlake, OhioAvon Lake, OhioNorth Ridgeville, OhioMedina, Ohio

Customer Reviews

No reviews yet. Be the first to review Spotlight Electric!

Write a Review

Frequently Asked Questions

How do I get a quote from Spotlight Electric?

You can request a quote through the form on this page or contact Spotlight Electric directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Spotlight Electric serve?

Spotlight Electric is based in Cleveland and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Spotlight Electric hold?

This profile lists the following reported certifications: BBB Accredited, Licensed Electrician. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Spotlight Electric offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Spotlight Electric for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Spotlight Electric for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Spotlight Electric handle permits and paperwork?

The exact scope is not verified on this profile. Ask Spotlight Electric which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2010
Employees1-10
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Spotlight Electric

Send your project details to request follow-up from Spotlight Electric. Response timing and consultation terms are set by the company.

For Spotlight Electric

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
S

Spotlight Electric

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.