S

Spokane Solar Power in Spokane

Spokane, Washington·Solar Installation
ResidentialCommercial
0

80 km

Service radius

2-10

Employees

Profile information

83%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About Spokane Solar Power

Local residential and commercial solar contractor serving Spokane County and surrounding areas

Spokane, Washington 99218

Spokane, Washington 99218

Services Offered

Solar InstallationMaintenance

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Spokane, WashingtonSpokane Valley, WashingtonDeer Park, WashingtonCheney, WashingtonAirway Heights, Washington

Customer Reviews

No reviews yet. Be the first to review Spokane Solar Power!

Write a Review

Frequently Asked Questions

How do I get a quote from Spokane Solar Power?

You can request a quote through the form on this page or contact Spokane Solar Power directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Spokane Solar Power serve?

Spokane Solar Power is based in Spokane and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Spokane Solar Power hold?

This profile does not list independently verified certifications. Ask Spokane Solar Power for current license, insurance, and credential details, then confirm them with the relevant authority.

What warranty does Spokane Solar Power offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Spokane Solar Power for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Spokane Solar Power for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Spokane Solar Power handle permits and paperwork?

The exact scope is not verified on this profile. Ask Spokane Solar Power which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

0
Employees2-10
Profile StatusUnclaimed
Profile Complete83%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Spokane Solar Power

Send your project details to request follow-up from Spokane Solar Power. Response timing and consultation terms are set by the company.

For Spokane Solar Power

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
S

Spokane Solar Power

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.