Specialty Service Group in Knoxville
150 km
Service radius
11-50
Employees
Profile information
About Specialty Service Group
Full-service electrical and solar contractor serving industrial, commercial, and residential clients from Knoxville
Knoxville, Tennessee 37912
Knoxville, Tennessee 37912
Services Offered
Reported Certifications
These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
12yr
Inverter Warranty
10yr
Installation Warranty
Questions to Ask About Installation
Initial Consultation
Ask whether a site assessment is offered, what it covers, and whether it has a fee.
System Design
Request a design showing the proposed equipment, layout, assumptions, and itemized costs.
Permitting & Approval
Confirm who handles permits, inspections, and utility interconnection, and which fees are included.
Installation
Verify the installation team’s licenses, relevant certifications, and insurance.
Commissioning & Handover
Confirm the testing records, monitoring access, warranty registration, and support included in the handover.
Service Areas
Customer Reviews
No reviews yet. Be the first to review Specialty Service Group!
Frequently Asked Questions
How do I get a quote from Specialty Service Group?
You can request a quote through the form on this page or contact Specialty Service Group directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does Specialty Service Group serve?
Specialty Service Group is based in Knoxville and serves within a 150 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does Specialty Service Group hold?
This profile lists the following reported certifications: Licensed Electrical Contractor. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.
What warranty does Specialty Service Group offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Specialty Service Group for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask Specialty Service Group for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does Specialty Service Group handle permits and paperwork?
The exact scope is not verified on this profile. Ask Specialty Service Group which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Contact Information
Request a QuoteBusiness Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Request a Quote from Specialty Service Group
Send your project details to request follow-up from Specialty Service Group. Response timing and consultation terms are set by the company.
For Specialty Service Group
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
Specialty Service Group