Southern Solar Systems in Huntsville
19+ yrs
Experience
150 km
Service radius
1-10
Employees
Profile information
About Southern Solar Systems
Huntsville's established solar and geothermal installer since 2007 serving residential and commercial clients across the Southeast
Huntsville, Alabama 35803
Huntsville, Alabama 35803
Services Offered
Reported Certifications
These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.
Reported Equipment Brands
Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.
Batteries
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
25yr
Inverter Warranty
10yr
Installation Warranty
Questions to Ask About Installation
Initial Consultation
Ask whether a site assessment is offered, what it covers, and whether it has a fee.
System Design
Request a design showing the proposed equipment, layout, assumptions, and itemized costs.
Permitting & Approval
Confirm who handles permits, inspections, and utility interconnection, and which fees are included.
Installation
Verify the installation team’s licenses, relevant certifications, and insurance.
Commissioning & Handover
Confirm the testing records, monitoring access, warranty registration, and support included in the handover.
Service Areas
Customer Reviews
No reviews yet. Be the first to review Southern Solar Systems!
Frequently Asked Questions
How do I get a quote from Southern Solar Systems?
You can request a quote through the form on this page or contact Southern Solar Systems directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does Southern Solar Systems serve?
Southern Solar Systems is based in Huntsville and serves within a 150 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does Southern Solar Systems hold?
This profile lists the following reported certifications: NABCEP Certified, Licensed Electrical Contractor, Alabama Solar Industry Association Member. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.
What warranty does Southern Solar Systems offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Southern Solar Systems for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask Southern Solar Systems for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does Southern Solar Systems handle permits and paperwork?
The exact scope is not verified on this profile. Ask Southern Solar Systems which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Business Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Request a Quote from Southern Solar Systems
Send your project details to request follow-up from Southern Solar Systems. Response timing and consultation terms are set by the company.
For Southern Solar Systems
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
Southern Solar Systems