S

Southern Exposure Solar in New Orleans

New Orleans, Louisiana·Solar Installation
ResidentialCommercial

11+ yrs

Experience

300 km

Service radius

11-50

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Southern Exposure Solar

Gulf Coast solar installer with 25+ years of combined experience serving New Orleans and Southeast Louisiana

New Orleans, Louisiana 70503

New Orleans, Louisiana 70503

Services Offered

Solar InstallationBattery StorageSolar DesignMaintenance

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Batteries

LG Chem

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

New Orleans, LouisianaMetairie, LouisianaLafayette, LouisianaBaton Rouge, LouisianaLake Charles, LouisianaHouma, LouisianaSlidell, LouisianaHouston, Louisiana

Customer Reviews

No reviews yet. Be the first to review Southern Exposure Solar!

Write a Review

Frequently Asked Questions

How do I get a quote from Southern Exposure Solar?

You can request a quote through the form on this page or contact Southern Exposure Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Southern Exposure Solar serve?

Southern Exposure Solar is based in New Orleans and serves within a 300 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Southern Exposure Solar hold?

This profile does not list independently verified certifications. Ask Southern Exposure Solar for current license, insurance, and credential details, then confirm them with the relevant authority.

What warranty does Southern Exposure Solar offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Southern Exposure Solar for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Southern Exposure Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Southern Exposure Solar handle permits and paperwork?

The exact scope is not verified on this profile. Ask Southern Exposure Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2015
Employees11-50
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Southern Exposure Solar

Send your project details to request follow-up from Southern Exposure Solar. Response timing and consultation terms are set by the company.

For Southern Exposure Solar

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
S

Southern Exposure Solar

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.