S

Southern Energy Management in Greensboro

Greensboro, North Carolina·Solar Installation
ResidentialCommercial

25+ yrs

Experience

150 km

Service radius

51-200

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Southern Energy Management

NC's original solar company since 2001 with 190+ team members and 20+ years of residential and commercial experience

Greensboro, North Carolina 27617

Greensboro, North Carolina 27617

Services Offered

Solar InstallationBattery StorageMaintenanceSolar DesignEnergy Audit

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

NABCEP CertifiedBBB Accredited

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Inverters

TeslaSolarEdge

Batteries

Tesla Powerwall

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Greensboro, North CarolinaRaleigh, North CarolinaDurham, North CarolinaChapel Hill, North CarolinaWinston-Salem, North CarolinaBurlington, North Carolina

Customer Reviews

No reviews yet. Be the first to review Southern Energy Management!

Write a Review

Frequently Asked Questions

How do I get a quote from Southern Energy Management?

You can request a quote through the form on this page or contact Southern Energy Management directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Southern Energy Management serve?

Southern Energy Management is based in Greensboro and serves within a 150 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Southern Energy Management hold?

This profile lists the following reported certifications: NABCEP Certified, BBB Accredited. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Southern Energy Management offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Southern Energy Management for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Southern Energy Management for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Southern Energy Management handle permits and paperwork?

The exact scope is not verified on this profile. Ask Southern Energy Management which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2001
Employees51-200
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Southern Energy Management

Send your project details to request follow-up from Southern Energy Management. Response timing and consultation terms are set by the company.

For Southern Energy Management

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
S

Southern Energy Management

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.