S

Southern Current in Charleston

Charleston, South Carolina·Solar Installation
ResidentialCommercial

10+ yrs

Experience

150 km

Service radius

11-50

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Southern Current

Charleston-based solar developer and EPC contractor handling residential, commercial, and utility-scale projects since 2016

Charleston, South Carolina 29405

Charleston, South Carolina 29405

Services Offered

Solar InstallationBattery StorageSolar DesignEnergy AuditGrid ConnectionMaintenanceMonitoring

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

BBB Accredited

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

Hanwha Q CellsCanadian Solar

Inverters

SolarEdgeEnphase

Batteries

Tesla Powerwall

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Charleston, South CarolinaNorth Charleston, South CarolinaMount Pleasant, South CarolinaSummerville, South CarolinaColumbia, South Carolina

Customer Reviews

No reviews yet. Be the first to review Southern Current!

Write a Review

Frequently Asked Questions

How do I get a quote from Southern Current?

You can request a quote through the form on this page or contact Southern Current directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Southern Current serve?

Southern Current is based in Charleston and serves within a 150 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Southern Current hold?

This profile lists the following reported certifications: BBB Accredited. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Southern Current offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Southern Current for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Southern Current for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Southern Current handle permits and paperwork?

The exact scope is not verified on this profile. Ask Southern Current which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2016
Employees11-50
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Southern Current

Send your project details to request follow-up from Southern Current. Response timing and consultation terms are set by the company.

For Southern Current

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
S

Southern Current

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.