S

South Shore Roofing in Savannah

Savannah, Georgia·Solar Installation
ResidentialCommercial

10+ yrs

Experience

100 km

Service radius

11-50

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About South Shore Roofing

Published directory profile for South Shore Roofing in Savannah. Verify services, credentials, ratings, and references directly with their original sources.

Savannah, Georgia 31405

Savannah, Georgia 31405

Services Offered

Solar InstallationRoof AssessmentMaintenance

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

BBB Accredited

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Savannah, GeorgiaPooler, GeorgiaRichmond Hill, GeorgiaHinesville, GeorgiaTybee Island, GeorgiaStatesboro, Georgia

Customer Reviews

No reviews yet. Be the first to review South Shore Roofing!

Write a Review

Frequently Asked Questions

How do I get a quote from South Shore Roofing?

You can request a quote through the form on this page or contact South Shore Roofing directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does South Shore Roofing serve?

South Shore Roofing is based in Savannah and serves within a 100 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does South Shore Roofing hold?

This profile lists the following reported certifications: BBB Accredited. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does South Shore Roofing offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask South Shore Roofing for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask South Shore Roofing for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does South Shore Roofing handle permits and paperwork?

The exact scope is not verified on this profile. Ask South Shore Roofing which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2016
Employees11-50
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from South Shore Roofing

Send your project details to request follow-up from South Shore Roofing. Response timing and consultation terms are set by the company.

For South Shore Roofing

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
S

South Shore Roofing

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.