S

South Coast Solar in New Orleans

New Orleans, Louisiana·Solar Installation
ResidentialCommercial

19+ yrs

Experience

200 km

Service radius

11-50

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About South Coast Solar

Louisiana's largest SunPower Master Dealer and Tesla Powerwall installer with NABCEP-certified crews since 2007

New Orleans, Louisiana 70002

New Orleans, Louisiana 70002

Services Offered

Solar InstallationBattery StorageSolar DesignCommercial SolarMaintenance

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

NABCEPSunPower Master DealerTesla Powerwall Certified InstallerBBB A+ Rating

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

SunPower

Batteries

Tesla Powerwall

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

New Orleans, LouisianaMetairie, LouisianaKenner, LouisianaSlidell, LouisianaCovington, LouisianaMandeville, LouisianaBaton Rouge, LouisianaHammond, Louisiana

Customer Reviews

No reviews yet. Be the first to review South Coast Solar!

Write a Review

Frequently Asked Questions

How do I get a quote from South Coast Solar?

You can request a quote through the form on this page or contact South Coast Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does South Coast Solar serve?

South Coast Solar is based in New Orleans and serves within a 200 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does South Coast Solar hold?

This profile lists the following reported certifications: NABCEP, SunPower Master Dealer, Tesla Powerwall Certified Installer, BBB A+ Rating. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does South Coast Solar offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask South Coast Solar for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask South Coast Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does South Coast Solar handle permits and paperwork?

The exact scope is not verified on this profile. Ask South Coast Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2007
Employees11-50
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from South Coast Solar

Send your project details to request follow-up from South Coast Solar. Response timing and consultation terms are set by the company.

For South Coast Solar

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
S

South Coast Solar

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.