S

South Carolina Solar in Charleston

Charleston, South Carolina·Solar Installation
ResidentialCommercial

11+ yrs

Experience

150 km

Service radius

11-50

Employees

Profile information

83%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About South Carolina Solar

Locally owned solar contractor with a corporate office in Charleston and statewide coverage from three locations

Charleston, South Carolina 29492

Charleston, South Carolina 29492

Services Offered

Solar InstallationBattery StorageSolar DesignEnergy AuditGrid Connection

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

Hanwha Q CellsREC

Inverters

EnphaseSolarEdge

Batteries

Tesla Powerwall

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Charleston, South CarolinaMount Pleasant, South CarolinaNorth Charleston, South CarolinaSummerville, South CarolinaColumbia, South CarolinaGreenville, South Carolina

Customer Reviews

No reviews yet. Be the first to review South Carolina Solar!

Write a Review

Frequently Asked Questions

How do I get a quote from South Carolina Solar?

You can request a quote through the form on this page or contact South Carolina Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does South Carolina Solar serve?

South Carolina Solar is based in Charleston and serves within a 150 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does South Carolina Solar hold?

This profile does not list independently verified certifications. Ask South Carolina Solar for current license, insurance, and credential details, then confirm them with the relevant authority.

What warranty does South Carolina Solar offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask South Carolina Solar for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask South Carolina Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does South Carolina Solar handle permits and paperwork?

The exact scope is not verified on this profile. Ask South Carolina Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Request a Quote

Business Details

Founded2015
Employees11-50
Profile StatusUnclaimed
Profile Complete83%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from South Carolina Solar

Send your project details to request follow-up from South Carolina Solar. Response timing and consultation terms are set by the company.

For South Carolina Solar

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
S

South Carolina Solar

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.