S

Solux Power in Oklahoma City

Oklahoma City, Oklahoma·Solar Installation
ResidentialCommercial
0

80 km

Service radius

2-10

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Solux Power

Local Oklahoma City solar installer offering affordable residential and commercial solar solutions

Oklahoma City, Oklahoma 73179

Oklahoma City, Oklahoma 73179

Services Offered

Solar Installation

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Oklahoma City, OklahomaMoore, OklahomaNorman, OklahomaYukon, OklahomaMustang, OklahomaMidwest City, Oklahoma

Customer Reviews

No reviews yet. Be the first to review Solux Power!

Write a Review

Frequently Asked Questions

How do I get a quote from Solux Power?

You can request a quote through the form on this page or contact Solux Power directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Solux Power serve?

Solux Power is based in Oklahoma City and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Solux Power hold?

This profile does not list independently verified certifications. Ask Solux Power for current license, insurance, and credential details, then confirm them with the relevant authority.

What warranty does Solux Power offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Solux Power for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Solux Power for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Solux Power handle permits and paperwork?

The exact scope is not verified on this profile. Ask Solux Power which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

0
Employees2-10
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Solux Power

Send your project details to request follow-up from Solux Power. Response timing and consultation terms are set by the company.

For Solux Power

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
S

Solux Power

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.