Solar Works Energy in Santa Fe
120 km
Service radius
11-50
Employees
Profile information
About Solar Works Energy
New Mexico solar installer serving Santa Fe with offices in Albuquerque and Las Cruces
Santa Fe, New Mexico 87110
Santa Fe, New Mexico 87110
Services Offered
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
25yr
Inverter Warranty
10yr
Installation Warranty
Questions to Ask About Installation
Initial Consultation
Ask whether a site assessment is offered, what it covers, and whether it has a fee.
System Design
Request a design showing the proposed equipment, layout, assumptions, and itemized costs.
Permitting & Approval
Confirm who handles permits, inspections, and utility interconnection, and which fees are included.
Installation
Verify the installation team’s licenses, relevant certifications, and insurance.
Commissioning & Handover
Confirm the testing records, monitoring access, warranty registration, and support included in the handover.
Service Areas
Customer Reviews
No reviews yet. Be the first to review Solar Works Energy!
Frequently Asked Questions
How do I get a quote from Solar Works Energy?
You can request a quote through the form on this page or contact Solar Works Energy directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does Solar Works Energy serve?
Solar Works Energy is based in Santa Fe and serves within a 120 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does Solar Works Energy hold?
This profile does not list independently verified certifications. Ask Solar Works Energy for current license, insurance, and credential details, then confirm them with the relevant authority.
What warranty does Solar Works Energy offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Solar Works Energy for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask Solar Works Energy for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does Solar Works Energy handle permits and paperwork?
The exact scope is not verified on this profile. Ask Solar Works Energy which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Business Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Request a Quote from Solar Works Energy
Send your project details to request follow-up from Solar Works Energy. Response timing and consultation terms are set by the company.
For Solar Works Energy
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
Solar Works Energy