S

Solar Topps in Phoenix

Phoenix, Arizona·Solar Installation
ResidentialCommercial

17+ yrs

Experience

80 km

Service radius

11-50

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Solar Topps

NABCEP-certified solar engineering firm delivering premium installations at competitive prices since 2009

Phoenix, Arizona 85034

Phoenix, Arizona 85034

Services Offered

Solar InstallationBattery StorageEV ChargingSolar DesignMaintenanceMonitoringGrid Connection

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

NABCEPTesla Certified InstallerEnphase Gold InstallerREC Certified Solar ProfessionalBBB Accredited

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

RECQ CellsSilfab

Inverters

EnphaseSolarEdge

Batteries

Tesla PowerwallEnphase IQ Battery

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

25yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Phoenix, ArizonaScottsdale, ArizonaTempe, ArizonaMesa, ArizonaChandler, ArizonaGilbert, ArizonaGlendale, ArizonaPeoria, ArizonaSurprise, Arizona

Customer Reviews

No reviews yet. Be the first to review Solar Topps!

Write a Review

Frequently Asked Questions

How do I get a quote from Solar Topps?

You can request a quote through the form on this page or contact Solar Topps directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Solar Topps serve?

Solar Topps is based in Phoenix and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Solar Topps hold?

This profile lists the following reported certifications: NABCEP, Tesla Certified Installer, Enphase Gold Installer, REC Certified Solar Professional, BBB Accredited. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Solar Topps offer?

This profile reports 25-year panel coverage and 25-year workmanship coverage. Ask Solar Topps for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Solar Topps for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Solar Topps handle permits and paperwork?

The exact scope is not verified on this profile. Ask Solar Topps which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2009
Employees11-50
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Solar Topps

Send your project details to request follow-up from Solar Topps. Response timing and consultation terms are set by the company.

For Solar Topps

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
S

Solar Topps

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.