Solar States in Philadelphia
18+ yrs
Experience
120 km
Service radius
11-50
Employees
Profile information
About Solar States
Philadelphia's B-Corp solar installer and educator — nearly 300 installations and 132 students trained in 2025
Philadelphia, Pennsylvania 19122
Philadelphia, Pennsylvania 19122
Services Offered
Reported Certifications
These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.
Reported Equipment Brands
Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.
Panels
Inverters
Batteries
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
25yr
Inverter Warranty
10yr
Installation Warranty
Questions to Ask About Installation
Initial Consultation
Ask whether a site assessment is offered, what it covers, and whether it has a fee.
System Design
Request a design showing the proposed equipment, layout, assumptions, and itemized costs.
Permitting & Approval
Confirm who handles permits, inspections, and utility interconnection, and which fees are included.
Installation
Verify the installation team’s licenses, relevant certifications, and insurance.
Commissioning & Handover
Confirm the testing records, monitoring access, warranty registration, and support included in the handover.
Service Areas
Customer Reviews
No reviews yet. Be the first to review Solar States!
Frequently Asked Questions
How do I get a quote from Solar States?
You can request a quote through the form on this page or contact Solar States directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does Solar States serve?
Solar States is based in Philadelphia and serves within a 120 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does Solar States hold?
This profile lists the following reported certifications: NABCEP, B Corp Certified. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.
What warranty does Solar States offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Solar States for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask Solar States for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does Solar States handle permits and paperwork?
The exact scope is not verified on this profile. Ask Solar States which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Contact Information
Request a QuoteBusiness Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Request a Quote from Solar States
Send your project details to request follow-up from Solar States. Response timing and consultation terms are set by the company.
For Solar States
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
Solar States