S

Solar Side Up in Denver

Denver, Colorado·Solar Installation
ResidentialCommercial

15+ yrs

Experience

1500+

Projects

80 km

Service radius

11-50

Employees

Profile information

83%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About Solar Side Up

Denver's trusted Enphase Platinum Installer with 1,500+ solar installations since 2011

Denver, Colorado 80206

Denver, Colorado 80206

Services Offered

Solar InstallationBattery StorageMaintenanceMonitoringRoof AssessmentSolar Design

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

NABCEPEnphase PlatinumSEIA MemberASES Member

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

SilfabRECCanadian Solar

Inverters

Enphase

Batteries

EnphaseTesla Powerwall

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Denver, ColoradoAurora, ColoradoLakewood, ColoradoLittleton, ColoradoArvada, ColoradoWestminster, ColoradoCentennial, ColoradoGolden, ColoradoEnglewood, ColoradoThornton, Colorado

Customer Reviews

No reviews yet. Be the first to review Solar Side Up!

Write a Review

Frequently Asked Questions

How do I get a quote from Solar Side Up?

You can request a quote through the form on this page or contact Solar Side Up directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Solar Side Up serve?

Solar Side Up is based in Denver and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Solar Side Up hold?

This profile lists the following reported certifications: NABCEP, Enphase Platinum, SEIA Member, ASES Member. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Solar Side Up offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Solar Side Up for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Solar Side Up for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Solar Side Up handle permits and paperwork?

The exact scope is not verified on this profile. Ask Solar Side Up which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Request a Quote

Business Details

Founded2011
Employees11-50
Profile StatusUnclaimed
Profile Complete83%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Solar Side Up

Send your project details to request follow-up from Solar Side Up. Response timing and consultation terms are set by the company.

For Solar Side Up

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
S

Solar Side Up

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.