Solar Pros AZ in Tucson
8+ yrs
Experience
80 km
Service radius
11-50
Employees
Profile information
About Solar Pros AZ
Licensed, bonded, and insured Tucson solar installer with 25-year all-inclusive warranty coverage
Tucson, Arizona 85745
Tucson, Arizona 85745
Services Offered
Reported Certifications
These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.
Reported Equipment Brands
Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.
Panels
Inverters
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
25yr
Inverter Warranty
25yr
Installation Warranty
Questions to Ask About Installation
Initial Consultation
Ask whether a site assessment is offered, what it covers, and whether it has a fee.
System Design
Request a design showing the proposed equipment, layout, assumptions, and itemized costs.
Permitting & Approval
Confirm who handles permits, inspections, and utility interconnection, and which fees are included.
Installation
Verify the installation team’s licenses, relevant certifications, and insurance.
Commissioning & Handover
Confirm the testing records, monitoring access, warranty registration, and support included in the handover.
Service Areas
Customer Reviews
No reviews yet. Be the first to review Solar Pros AZ!
Frequently Asked Questions
How do I get a quote from Solar Pros AZ?
You can request a quote through the form on this page or contact Solar Pros AZ directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does Solar Pros AZ serve?
Solar Pros AZ is based in Tucson and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does Solar Pros AZ hold?
This profile lists the following reported certifications: BBB Accredited, ROC Licensed. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.
What warranty does Solar Pros AZ offer?
This profile reports 25-year panel coverage and 25-year workmanship coverage. Ask Solar Pros AZ for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask Solar Pros AZ for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does Solar Pros AZ handle permits and paperwork?
The exact scope is not verified on this profile. Ask Solar Pros AZ which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Business Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Request a Quote from Solar Pros AZ
Send your project details to request follow-up from Solar Pros AZ. Response timing and consultation terms are set by the company.
For Solar Pros AZ
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
Solar Pros AZ