S

Solar Plus in Atlanta

Atlanta, Georgia·Solar Installation
ResidentialCommercial

10+ yrs

Experience

100 km

Service radius

11-50

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Solar Plus

NABCEP-certified Atlanta solar installer since 2016, led by owner-operator Don Tonic with hands-on crew leadership on every project

Atlanta, Georgia 30308

Atlanta, Georgia 30308

Services Offered

Solar InstallationBattery StorageSolar DesignRoof AssessmentGrid ConnectionMaintenance

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

NABCEP Certified PV Installation ProfessionalOSHA CertifiedLicensed Electrical Contractor

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

Canadian Solar

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Atlanta, GeorgiaDecatur, GeorgiaMidtown, GeorgiaBuckhead, GeorgiaEast Atlanta, GeorgiaCharlotte, GeorgiaGreenville, GeorgiaColumbia, Georgia

Customer Reviews

No reviews yet. Be the first to review Solar Plus!

Write a Review

Frequently Asked Questions

How do I get a quote from Solar Plus?

You can request a quote through the form on this page or contact Solar Plus directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Solar Plus serve?

Solar Plus is based in Atlanta and serves within a 100 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Solar Plus hold?

This profile lists the following reported certifications: NABCEP Certified PV Installation Professional, OSHA Certified, Licensed Electrical Contractor. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Solar Plus offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Solar Plus for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Solar Plus for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Solar Plus handle permits and paperwork?

The exact scope is not verified on this profile. Ask Solar Plus which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2016
Employees11-50
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Solar Plus

Send your project details to request follow-up from Solar Plus. Response timing and consultation terms are set by the company.

For Solar Plus

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
S

Solar Plus

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.