S

Solar Penny in Mesa

Mesa, Arizona·Solar Installation
ResidentialOff-Grid

21+ yrs

Experience

60 km

Service radius

1-10

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Solar Penny

Mesa solar retail store and installer offering DIY components to complete system design since 2005

Mesa, Arizona 85205

Mesa, Arizona 85205

Services Offered

Solar Installationsystem_design

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Inverters

Magnum Dimensions

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

10yr

Inverter Warranty

5yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Mesa, ArizonaPhoenix, ArizonaScottsdale, ArizonaTempe, ArizonaGilbert, ArizonaChandler, Arizona

Customer Reviews

No reviews yet. Be the first to review Solar Penny!

Write a Review

Frequently Asked Questions

How do I get a quote from Solar Penny?

You can request a quote through the form on this page or contact Solar Penny directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Solar Penny serve?

Solar Penny is based in Mesa and serves within a 60 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Solar Penny hold?

This profile does not list independently verified certifications. Ask Solar Penny for current license, insurance, and credential details, then confirm them with the relevant authority.

What warranty does Solar Penny offer?

This profile reports 25-year panel coverage and 5-year workmanship coverage. Ask Solar Penny for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Solar Penny for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Solar Penny handle permits and paperwork?

The exact scope is not verified on this profile. Ask Solar Penny which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2005
Employees1-10
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Solar Penny

Send your project details to request follow-up from Solar Penny. Response timing and consultation terms are set by the company.

For Solar Penny

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
S

Solar Penny

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.