S

Solar Optimum in Riverside

Riverside, California·Solar Installation
ResidentialCommercial

18+ yrs

Experience

100 km

Service radius

201-500

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Solar Optimum

EnergySage Installer of the Year serving Riverside from their Inland Empire office

Riverside, California 92505

Riverside, California 92505

Services Offered

Solar InstallationBattery StorageEV Charging

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Riverside, CaliforniaSan Bernardino, CaliforniaOntario, CaliforniaRancho Cucamonga, CaliforniaCorona, California

Customer Reviews

No reviews yet. Be the first to review Solar Optimum!

Write a Review

Frequently Asked Questions

How do I get a quote from Solar Optimum?

You can request a quote through the form on this page or contact Solar Optimum directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Solar Optimum serve?

Solar Optimum is based in Riverside and serves within a 100 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Solar Optimum hold?

This profile does not list independently verified certifications. Ask Solar Optimum for current license, insurance, and credential details, then confirm them with the relevant authority.

What warranty does Solar Optimum offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Solar Optimum for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Solar Optimum for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Solar Optimum handle permits and paperwork?

The exact scope is not verified on this profile. Ask Solar Optimum which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2008
Employees201-500
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Solar Optimum

Send your project details to request follow-up from Solar Optimum. Response timing and consultation terms are set by the company.

For Solar Optimum

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
S

Solar Optimum

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.