Solar Optimum in Los Angeles
18+ yrs
Experience
120 km
Service radius
51-200
Employees
Profile information
About Solar Optimum
California's #1 residential solar contractor — award-winning solar, battery, and roofing installations since 2008
Los Angeles, California 91201
Los Angeles, California 91201
Services Offered
Reported Certifications
These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.
Reported Equipment Brands
Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.
Panels
Inverters
Batteries
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
25yr
Inverter Warranty
25yr
Installation Warranty
Questions to Ask About Installation
Initial Consultation
Ask whether a site assessment is offered, what it covers, and whether it has a fee.
System Design
Request a design showing the proposed equipment, layout, assumptions, and itemized costs.
Permitting & Approval
Confirm who handles permits, inspections, and utility interconnection, and which fees are included.
Installation
Verify the installation team’s licenses, relevant certifications, and insurance.
Commissioning & Handover
Confirm the testing records, monitoring access, warranty registration, and support included in the handover.
Service Areas
Customer Reviews
No reviews yet. Be the first to review Solar Optimum!
Frequently Asked Questions
How do I get a quote from Solar Optimum?
You can request a quote through the form on this page or contact Solar Optimum directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does Solar Optimum serve?
Solar Optimum is based in Los Angeles and serves within a 120 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does Solar Optimum hold?
This profile lists the following reported certifications: Tesla Certified, Enphase Platinum, GAF Certified, QCells Certified, CertainTeed Certified. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.
What warranty does Solar Optimum offer?
This profile reports 25-year panel coverage and 25-year workmanship coverage. Ask Solar Optimum for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask Solar Optimum for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does Solar Optimum handle permits and paperwork?
The exact scope is not verified on this profile. Ask Solar Optimum which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Business Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Request a Quote from Solar Optimum
Send your project details to request follow-up from Solar Optimum. Response timing and consultation terms are set by the company.
For Solar Optimum
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
Solar Optimum