S

Solar Energy Systems in New York

New York, New York·Solar Installation
Commercial

28+ yrs

Experience

230+

Projects

80 km

Service radius

11-50

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Solar Energy Systems

Brooklyn-based commercial solar integrator with over 230 projects and 60 MW of solar since 1998

New York, New York 11222

New York, New York 11222

Services Offered

Solar InstallationSolar DesignMaintenanceMonitoringGrid Connection

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

NABCEPNYSERDA Certified

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Brooklyn, New YorkManhattan, New YorkQueens, New YorkBronx, New YorkStaten Island, New York

Customer Reviews

No reviews yet. Be the first to review Solar Energy Systems!

Write a Review

Frequently Asked Questions

How do I get a quote from Solar Energy Systems?

You can request a quote through the form on this page or contact Solar Energy Systems directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Solar Energy Systems serve?

Solar Energy Systems is based in New York and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Solar Energy Systems hold?

This profile lists the following reported certifications: NABCEP, NYSERDA Certified. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Solar Energy Systems offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Solar Energy Systems for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Solar Energy Systems for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Solar Energy Systems handle permits and paperwork?

The exact scope is not verified on this profile. Ask Solar Energy Systems which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded1998
Employees11-50
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Solar Energy Systems

Send your project details to request follow-up from Solar Energy Systems. Response timing and consultation terms are set by the company.

For Solar Energy Systems

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
S

Solar Energy Systems

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.