Solar Energy Labs in Jacksonville
53+ yrs
Experience
100 km
Service radius
1-10
Employees
Profile information
About Solar Energy Labs
Jacksonville's oldest solar provider since 1973, with over 50 years of installation and service experience
Jacksonville, Florida 32254
Jacksonville, Florida 32254
Services Offered
Reported Certifications
These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.
Reported Equipment Brands
Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.
Panels
Inverters
Batteries
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
12yr
Inverter Warranty
10yr
Installation Warranty
Questions to Ask About Installation
Initial Consultation
Ask whether a site assessment is offered, what it covers, and whether it has a fee.
System Design
Request a design showing the proposed equipment, layout, assumptions, and itemized costs.
Permitting & Approval
Confirm who handles permits, inspections, and utility interconnection, and which fees are included.
Installation
Verify the installation team’s licenses, relevant certifications, and insurance.
Commissioning & Handover
Confirm the testing records, monitoring access, warranty registration, and support included in the handover.
Service Areas
Customer Reviews
No reviews yet. Be the first to review Solar Energy Labs!
Frequently Asked Questions
How do I get a quote from Solar Energy Labs?
You can request a quote through the form on this page or contact Solar Energy Labs directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does Solar Energy Labs serve?
Solar Energy Labs is based in Jacksonville and serves within a 100 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does Solar Energy Labs hold?
This profile lists the following reported certifications: BBB Accredited, FL Certified Solar Contractor CVC56672. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.
What warranty does Solar Energy Labs offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Solar Energy Labs for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask Solar Energy Labs for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does Solar Energy Labs handle permits and paperwork?
The exact scope is not verified on this profile. Ask Solar Energy Labs which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Contact Information
Request a QuoteBusiness Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Request a Quote from Solar Energy Labs
Send your project details to request follow-up from Solar Energy Labs. Response timing and consultation terms are set by the company.
For Solar Energy Labs
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
Solar Energy Labs