Solar Energy Consultants in San Jose
10+ yrs
Experience
3118+
Projects
60 km
Service radius
11-50
Employees
Profile information
About Solar Energy Consultants
San Jose solar, roofing, and whole-home electrification specialists since 2016, with 3,118+ projects completed and all in-house crews
San Jose, California 95138
San Jose, California 95138
Services Offered
Reported Certifications
These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
25yr
Inverter Warranty
25yr
Installation Warranty
Questions to Ask About Installation
Initial Consultation
Ask whether a site assessment is offered, what it covers, and whether it has a fee.
System Design
Request a design showing the proposed equipment, layout, assumptions, and itemized costs.
Permitting & Approval
Confirm who handles permits, inspections, and utility interconnection, and which fees are included.
Installation
Verify the installation team’s licenses, relevant certifications, and insurance.
Commissioning & Handover
Confirm the testing records, monitoring access, warranty registration, and support included in the handover.
Service Areas
Customer Reviews
No reviews yet. Be the first to review Solar Energy Consultants!
Frequently Asked Questions
How do I get a quote from Solar Energy Consultants?
You can request a quote through the form on this page or contact Solar Energy Consultants directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does Solar Energy Consultants serve?
Solar Energy Consultants is based in San Jose and serves within a 60 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does Solar Energy Consultants hold?
This profile lists the following reported certifications: BBB Accredited, CSLB Licensed. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.
What warranty does Solar Energy Consultants offer?
This profile reports 25-year panel coverage and 25-year workmanship coverage. Ask Solar Energy Consultants for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask Solar Energy Consultants for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does Solar Energy Consultants handle permits and paperwork?
The exact scope is not verified on this profile. Ask Solar Energy Consultants which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Contact Information
Request a QuoteBusiness Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Request a Quote from Solar Energy Consultants
Send your project details to request follow-up from Solar Energy Consultants. Response timing and consultation terms are set by the company.
For Solar Energy Consultants
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
Solar Energy Consultants