S

Solar by CIR in Buffalo

Buffalo, New York·Solar Installation
ResidentialCommercialIndustrial

22+ yrs

Experience

1400+

Projects

100 km

Service radius

51-200

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Solar by CIR

NYSERDA Quality Installer with over 1,400 solar installations and 20 MW installed capacity across Western New York since 2004

Buffalo, New York 14072

Buffalo, New York 14072

Services Offered

Solar InstallationBattery StorageSolar DesignMaintenanceGrid Connection

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

NABCEP CertifiedNYSERDA Quality Installer

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Inverters

Enphase

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Buffalo, New YorkRochester, New YorkGrand Island, New YorkNiagara Falls, New YorkTonawanda, New YorkAmherst, New York

Customer Reviews

No reviews yet. Be the first to review Solar by CIR!

Write a Review

Frequently Asked Questions

How do I get a quote from Solar by CIR?

You can request a quote through the form on this page or contact Solar by CIR directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Solar by CIR serve?

Solar by CIR is based in Buffalo and serves within a 100 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Solar by CIR hold?

This profile lists the following reported certifications: NABCEP Certified, NYSERDA Quality Installer. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Solar by CIR offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Solar by CIR for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Solar by CIR for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Solar by CIR handle permits and paperwork?

The exact scope is not verified on this profile. Ask Solar by CIR which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2004
Employees51-200
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Solar by CIR

Send your project details to request follow-up from Solar by CIR. Response timing and consultation terms are set by the company.

For Solar by CIR

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
S

Solar by CIR

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.