S

Solar Alliance Southeast in Knoxville

Knoxville, Tennessee·Solar Installation
CommercialIndustrial

11+ yrs

Experience

200 km

Service radius

11-50

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Solar Alliance Southeast

NABCEP-certified EPC firm ranked among the top solar contractors nationwide with Knoxville headquarters

Knoxville, Tennessee 37920

Knoxville, Tennessee 37920

Services Offered

Solar InstallationBattery StorageEV ChargingMaintenanceMonitoring

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

NABCEP2025 Top Solar Contractor

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Knoxville, TennesseeNashville, TennesseeChattanooga, TennesseeOak Ridge, TennesseeMaryville, Tennessee

Customer Reviews

No reviews yet. Be the first to review Solar Alliance Southeast!

Write a Review

Frequently Asked Questions

How do I get a quote from Solar Alliance Southeast?

You can request a quote through the form on this page or contact Solar Alliance Southeast directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Solar Alliance Southeast serve?

Solar Alliance Southeast is based in Knoxville and serves within a 200 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Solar Alliance Southeast hold?

This profile lists the following reported certifications: NABCEP, 2025 Top Solar Contractor. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Solar Alliance Southeast offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Solar Alliance Southeast for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Solar Alliance Southeast for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Solar Alliance Southeast handle permits and paperwork?

The exact scope is not verified on this profile. Ask Solar Alliance Southeast which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2015
Employees11-50
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Solar Alliance Southeast

Send your project details to request follow-up from Solar Alliance Southeast. Response timing and consultation terms are set by the company.

For Solar Alliance Southeast

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
S

Solar Alliance Southeast

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.