S

Smart Wave Solar in Salt Lake City

Salt Lake City, Utah·Solar Installation
ResidentialCommercial

11+ yrs

Experience

100 km

Service radius

11-50

Employees

Profile information

83%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About Smart Wave Solar

NABCEP-certified residential and commercial solar installer serving Utah's Wasatch Front since 2015

Salt Lake City, Utah 84065

Salt Lake City, Utah 84065

Services Offered

Solar InstallationBattery StorageMaintenanceSolar Design

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

NABCEPBBB Accredited

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

Hyperion

Inverters

Enphase

Batteries

Tesla Powerwall

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

25yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Salt Lake City, UtahBluffdale, UtahSandy, UtahDraper, UtahWest Jordan, UtahSouth Jordan, UtahProvo, UtahOrem, Utah

Customer Reviews

No reviews yet. Be the first to review Smart Wave Solar!

Write a Review

Frequently Asked Questions

How do I get a quote from Smart Wave Solar?

You can request a quote through the form on this page or contact Smart Wave Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Smart Wave Solar serve?

Smart Wave Solar is based in Salt Lake City and serves within a 100 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Smart Wave Solar hold?

This profile lists the following reported certifications: NABCEP, BBB Accredited. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Smart Wave Solar offer?

This profile reports 25-year panel coverage and 25-year workmanship coverage. Ask Smart Wave Solar for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Smart Wave Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Smart Wave Solar handle permits and paperwork?

The exact scope is not verified on this profile. Ask Smart Wave Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

Founded2015
Employees11-50
Profile StatusUnclaimed
Profile Complete83%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Smart Wave Solar

Send your project details to request follow-up from Smart Wave Solar. Response timing and consultation terms are set by the company.

For Smart Wave Solar

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
S

Smart Wave Solar

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.