Simple Indy in Indianapolis
6+ yrs
Experience
100 km
Service radius
2-10
Employees
Profile information
About Simple Indy
Central Indiana's premier off-grid and hybrid solar specialist for homes, farms, and mobile applications
Indianapolis, Indiana 46204
Indianapolis, Indiana 46204
Services Offered
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
25yr
Inverter Warranty
5yr
Installation Warranty
Questions to Ask About Installation
Initial Consultation
Ask whether a site assessment is offered, what it covers, and whether it has a fee.
System Design
Request a design showing the proposed equipment, layout, assumptions, and itemized costs.
Permitting & Approval
Confirm who handles permits, inspections, and utility interconnection, and which fees are included.
Installation
Verify the installation team’s licenses, relevant certifications, and insurance.
Commissioning & Handover
Confirm the testing records, monitoring access, warranty registration, and support included in the handover.
Service Areas
Customer Reviews
No reviews yet. Be the first to review Simple Indy!
Frequently Asked Questions
How do I get a quote from Simple Indy?
You can request a quote through the form on this page or contact Simple Indy directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does Simple Indy serve?
Simple Indy is based in Indianapolis and serves within a 100 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does Simple Indy hold?
This profile does not list independently verified certifications. Ask Simple Indy for current license, insurance, and credential details, then confirm them with the relevant authority.
What warranty does Simple Indy offer?
This profile reports 25-year panel coverage and 5-year workmanship coverage. Ask Simple Indy for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask Simple Indy for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does Simple Indy handle permits and paperwork?
The exact scope is not verified on this profile. Ask Simple Indy which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Business Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Request a Quote from Simple Indy
Send your project details to request follow-up from Simple Indy. Response timing and consultation terms are set by the company.
For Simple Indy
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
Simple Indy