Sierra Solar Systems in Reno
21+ yrs
Experience
80 km
Service radius
1-10
Employees
Profile information
About Sierra Solar Systems
Reno solar contractor founded in 2005 by construction veterans serving Northern Nevada and Carson City
Reno, Nevada 89511
Reno, Nevada 89511
Services Offered
Reported Certifications
These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
25yr
Inverter Warranty
10yr
Installation Warranty
Questions to Ask About Installation
Initial Consultation
Ask whether a site assessment is offered, what it covers, and whether it has a fee.
System Design
Request a design showing the proposed equipment, layout, assumptions, and itemized costs.
Permitting & Approval
Confirm who handles permits, inspections, and utility interconnection, and which fees are included.
Installation
Verify the installation team’s licenses, relevant certifications, and insurance.
Commissioning & Handover
Confirm the testing records, monitoring access, warranty registration, and support included in the handover.
Service Areas
Customer Reviews
No reviews yet. Be the first to review Sierra Solar Systems!
Frequently Asked Questions
How do I get a quote from Sierra Solar Systems?
You can request a quote through the form on this page or contact Sierra Solar Systems directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does Sierra Solar Systems serve?
Sierra Solar Systems is based in Reno and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does Sierra Solar Systems hold?
This profile lists the following reported certifications: Nevada Licensed Contractor. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.
What warranty does Sierra Solar Systems offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Sierra Solar Systems for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask Sierra Solar Systems for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does Sierra Solar Systems handle permits and paperwork?
The exact scope is not verified on this profile. Ask Sierra Solar Systems which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Contact Information
Request a QuoteBusiness Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Request a Quote from Sierra Solar Systems
Send your project details to request follow-up from Sierra Solar Systems. Response timing and consultation terms are set by the company.
For Sierra Solar Systems
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
Sierra Solar Systems