S

Shoreline Solar in Hartford

Hartford, Connecticut·Solar Installation
Residential

11+ yrs

Experience

500+

Projects

100 km

Service radius

11-50

Employees

Profile information

83%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About Shoreline Solar

Locally owned Connecticut solar installer with over 500 installations and 10 years of market expertise

Hartford, Connecticut 06405

Hartford, Connecticut 06405

Services Offered

Solar InstallationBattery StorageSolar DesignEnergy AuditMaintenanceGrid Connection

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

CT Green Bank Contractor

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

QcellsREC

Inverters

Enphase

Batteries

Tesla PowerwallEnphase IQ Battery

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Hartford, ConnecticutWest Hartford, ConnecticutNew Haven, ConnecticutBranford, ConnecticutMiddletown, ConnecticutGuilford, ConnecticutWallingford, ConnecticutMeriden, Connecticut

Customer Reviews

No reviews yet. Be the first to review Shoreline Solar!

Write a Review

Frequently Asked Questions

How do I get a quote from Shoreline Solar?

You can request a quote through the form on this page or contact Shoreline Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Shoreline Solar serve?

Shoreline Solar is based in Hartford and serves within a 100 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Shoreline Solar hold?

This profile lists the following reported certifications: CT Green Bank Contractor. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Shoreline Solar offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Shoreline Solar for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Shoreline Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Shoreline Solar handle permits and paperwork?

The exact scope is not verified on this profile. Ask Shoreline Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

Founded2015
Employees11-50
Profile StatusUnclaimed
Profile Complete83%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Shoreline Solar

Send your project details to request follow-up from Shoreline Solar. Response timing and consultation terms are set by the company.

For Shoreline Solar

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
S

Shoreline Solar

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.