Semper Solaris in Fresno
14+ yrs
Experience
80 km
Service radius
101-500
Employees
Profile information
About Semper Solaris
Veteran-owned solar, battery, roofing, and HVAC contractor with 25-50 year warranties and 12 solar awards
Fresno, California 93727
Fresno, California 93727
Services Offered
Reported Certifications
These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.
Reported Equipment Brands
Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.
Inverters
Batteries
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
25yr
Inverter Warranty
25yr
Installation Warranty
Questions to Ask About Installation
Initial Consultation
Ask whether a site assessment is offered, what it covers, and whether it has a fee.
System Design
Request a design showing the proposed equipment, layout, assumptions, and itemized costs.
Permitting & Approval
Confirm who handles permits, inspections, and utility interconnection, and which fees are included.
Installation
Verify the installation team’s licenses, relevant certifications, and insurance.
Commissioning & Handover
Confirm the testing records, monitoring access, warranty registration, and support included in the handover.
Service Areas
Customer Reviews
No reviews yet. Be the first to review Semper Solaris!
Frequently Asked Questions
How do I get a quote from Semper Solaris?
You can request a quote through the form on this page or contact Semper Solaris directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does Semper Solaris serve?
Semper Solaris is based in Fresno and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does Semper Solaris hold?
This profile lists the following reported certifications: BBB Accredited, Owens Corning Platinum Preferred Contractor, Tesla Certified Installer. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.
What warranty does Semper Solaris offer?
This profile reports 25-year panel coverage and 25-year workmanship coverage. Ask Semper Solaris for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask Semper Solaris for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does Semper Solaris handle permits and paperwork?
The exact scope is not verified on this profile. Ask Semper Solaris which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Contact Information
Request a QuoteBusiness Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Request a Quote from Semper Solaris
Send your project details to request follow-up from Semper Solaris. Response timing and consultation terms are set by the company.
For Semper Solaris
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
Semper Solaris