S

Selenium Energy in Chicago

Chicago, Illinois·Solar Installation
ResidentialCommercial

9+ yrs

Experience

80 km

Service radius

1-10

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Selenium Energy

Solar energy developer and installer serving Chicagoland's south suburbs and NW Indiana

Chicago, Illinois 60461

Chicago, Illinois 60461

Services Offered

Solar InstallationBattery Storage

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Chicago, IllinoisOlympia Fields, IllinoisMatteson, IllinoisHomewood, IllinoisTinley Park, IllinoisGary, Illinois

Customer Reviews

No reviews yet. Be the first to review Selenium Energy!

Write a Review

Frequently Asked Questions

How do I get a quote from Selenium Energy?

You can request a quote through the form on this page or contact Selenium Energy directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Selenium Energy serve?

Selenium Energy is based in Chicago and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Selenium Energy hold?

This profile does not list independently verified certifications. Ask Selenium Energy for current license, insurance, and credential details, then confirm them with the relevant authority.

What warranty does Selenium Energy offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Selenium Energy for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Selenium Energy for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Selenium Energy handle permits and paperwork?

The exact scope is not verified on this profile. Ask Selenium Energy which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2017
Employees1-10
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Selenium Energy

Send your project details to request follow-up from Selenium Energy. Response timing and consultation terms are set by the company.

For Selenium Energy

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
S

Selenium Energy

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.