Second Sunrise Solar in Charleston
7+ yrs
Experience
80 km
Service radius
2-10
Employees
Profile information
About Second Sunrise Solar
Published directory profile for Second Sunrise Solar in Charleston. Verify services, credentials, ratings, and references directly with their original sources.
Charleston, South Carolina 29464
Charleston, South Carolina 29464
Services Offered
Reported Equipment Brands
Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.
Panels
Inverters
Batteries
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
12yr
Inverter Warranty
10yr
Installation Warranty
Questions to Ask About Installation
Initial Consultation
Ask whether a site assessment is offered, what it covers, and whether it has a fee.
System Design
Request a design showing the proposed equipment, layout, assumptions, and itemized costs.
Permitting & Approval
Confirm who handles permits, inspections, and utility interconnection, and which fees are included.
Installation
Verify the installation team’s licenses, relevant certifications, and insurance.
Commissioning & Handover
Confirm the testing records, monitoring access, warranty registration, and support included in the handover.
Service Areas
Customer Reviews
No reviews yet. Be the first to review Second Sunrise Solar!
Frequently Asked Questions
How do I get a quote from Second Sunrise Solar?
You can request a quote through the form on this page or contact Second Sunrise Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does Second Sunrise Solar serve?
Second Sunrise Solar is based in Charleston and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does Second Sunrise Solar hold?
This profile does not list independently verified certifications. Ask Second Sunrise Solar for current license, insurance, and credential details, then confirm them with the relevant authority.
What warranty does Second Sunrise Solar offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Second Sunrise Solar for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask Second Sunrise Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does Second Sunrise Solar handle permits and paperwork?
The exact scope is not verified on this profile. Ask Second Sunrise Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Contact Information
Request a QuoteBusiness Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Request a Quote from Second Sunrise Solar
Send your project details to request follow-up from Second Sunrise Solar. Response timing and consultation terms are set by the company.
For Second Sunrise Solar
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
Second Sunrise Solar