S

SC Solar Energy in Charleston

Charleston, South Carolina·Solar Installation
ResidentialCommercial

16+ yrs

Experience

80 km

Service radius

2-10

Employees

Profile information

83%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About SC Solar Energy

North Charleston solar company with over 14 years of experience serving residential and commercial clients

Charleston, South Carolina 29405

Charleston, South Carolina 29405

Services Offered

Solar InstallationBattery StorageSolar DesignEnergy AuditGrid Connection

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

Hanwha Q CellsREC

Inverters

EnphaseSolarEdge

Batteries

Tesla Powerwall

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Charleston, South CarolinaNorth Charleston, South CarolinaMount Pleasant, South CarolinaSummerville, South CarolinaGoose Creek, South CarolinaJames Island, South Carolina

Customer Reviews

No reviews yet. Be the first to review SC Solar Energy!

Write a Review

Frequently Asked Questions

How do I get a quote from SC Solar Energy?

You can request a quote through the form on this page or contact SC Solar Energy directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does SC Solar Energy serve?

SC Solar Energy is based in Charleston and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does SC Solar Energy hold?

This profile does not list independently verified certifications. Ask SC Solar Energy for current license, insurance, and credential details, then confirm them with the relevant authority.

What warranty does SC Solar Energy offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask SC Solar Energy for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask SC Solar Energy for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does SC Solar Energy handle permits and paperwork?

The exact scope is not verified on this profile. Ask SC Solar Energy which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

Founded2010
Employees2-10
Profile StatusUnclaimed
Profile Complete83%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from SC Solar Energy

Send your project details to request follow-up from SC Solar Energy. Response timing and consultation terms are set by the company.

For SC Solar Energy

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
S

SC Solar Energy

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.