R

RSRV Power in Charlotte

Charlotte, North Carolina·Solar Installation
Residential

9+ yrs

Experience

100 km

Service radius

11-50

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About RSRV Power

Carolina-based vertically integrated solar installer delivering residential solar from sales through post-installation support

Charlotte, North Carolina 28217

Charlotte, North Carolina 28217

Services Offered

Solar InstallationBattery StorageSolar DesignMonitoring

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

NABCEPBBB A+ Rating

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

Q CellsSilfab

Inverters

EnphaseSolarEdge

Batteries

EnphaseTesla Powerwall

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Charlotte, North CarolinaConcord, North CarolinaHuntersville, North CarolinaMatthews, North CarolinaIndian Trail, North CarolinaGastonia, North CarolinaRock Hill, North CarolinaMooresville, North Carolina

Customer Reviews

No reviews yet. Be the first to review RSRV Power!

Write a Review

Frequently Asked Questions

How do I get a quote from RSRV Power?

You can request a quote through the form on this page or contact RSRV Power directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does RSRV Power serve?

RSRV Power is based in Charlotte and serves within a 100 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does RSRV Power hold?

This profile lists the following reported certifications: NABCEP, BBB A+ Rating. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does RSRV Power offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask RSRV Power for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask RSRV Power for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does RSRV Power handle permits and paperwork?

The exact scope is not verified on this profile. Ask RSRV Power which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2017
Employees11-50
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from RSRV Power

Send your project details to request follow-up from RSRV Power. Response timing and consultation terms are set by the company.

For RSRV Power

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
R

RSRV Power

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.