R

Rooftop Power in Providence

Providence, Rhode Island·Solar Installation
ResidentialCommercial

9+ yrs

Experience

800+

Projects

80 km

Service radius

11-50

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Rooftop Power

Family-owned Rhode Island solar company with Elite installer status and dedicated residential and commercial services

Providence, Rhode Island 02886

Providence, Rhode Island 02886

Services Offered

Solar InstallationBattery StorageEV ChargingSolar DesignEnergy AuditMaintenanceGrid ConnectionCommercial Solar

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

NABCEPEnergySage Elite InstallerBBB Accredited

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

QcellsREC

Inverters

EnphaseSolarEdge

Batteries

Tesla PowerwallEnphase IQ Battery

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Providence, Rhode IslandWarwick, Rhode IslandCranston, Rhode IslandEast Providence, Rhode IslandPawtucket, Rhode IslandNorth Kingstown, Rhode IslandCoventry, Rhode IslandWest Warwick, Rhode Island

Customer Reviews

No reviews yet. Be the first to review Rooftop Power!

Write a Review

Frequently Asked Questions

How do I get a quote from Rooftop Power?

You can request a quote through the form on this page or contact Rooftop Power directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Rooftop Power serve?

Rooftop Power is based in Providence and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Rooftop Power hold?

This profile lists the following reported certifications: NABCEP, EnergySage Elite Installer, BBB Accredited. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Rooftop Power offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Rooftop Power for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Rooftop Power for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Rooftop Power handle permits and paperwork?

The exact scope is not verified on this profile. Ask Rooftop Power which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2017
Employees11-50
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Rooftop Power

Send your project details to request follow-up from Rooftop Power. Response timing and consultation terms are set by the company.

For Rooftop Power

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
R

Rooftop Power

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.