R

Roofed Right America in Milwaukee

Milwaukee, Wisconsin·Solar Installation
Commercial

21+ yrs

Experience

150+

Projects

100 km

Service radius

51-200

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Roofed Right America

Milwaukee's premier commercial roofing and solar installer with 20 years of experience and 120+ employees

Milwaukee, Wisconsin 53207

Milwaukee, Wisconsin 53207

Services Offered

Solar InstallationSolar DesignCommercial SolarRoof AssessmentMonitoringMaintenance

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

BBB Accredited

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Milwaukee, WisconsinWaukesha, WisconsinRacine, WisconsinKenosha, WisconsinWest Allis, WisconsinBrookfield, WisconsinWauwatosa, WisconsinOak Creek, WisconsinGreenfield, WisconsinFranklin, Wisconsin

Customer Reviews

No reviews yet. Be the first to review Roofed Right America!

Write a Review

Frequently Asked Questions

How do I get a quote from Roofed Right America?

You can request a quote through the form on this page or contact Roofed Right America directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Roofed Right America serve?

Roofed Right America is based in Milwaukee and serves within a 100 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Roofed Right America hold?

This profile lists the following reported certifications: BBB Accredited. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Roofed Right America offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Roofed Right America for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Roofed Right America for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Roofed Right America handle permits and paperwork?

The exact scope is not verified on this profile. Ask Roofed Right America which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2005
Employees51-200
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Roofed Right America

Send your project details to request follow-up from Roofed Right America. Response timing and consultation terms are set by the company.

For Roofed Right America

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
R

Roofed Right America

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.