R

Robco Electric in Las Vegas

Las Vegas, Nevada·Solar Installation
ResidentialCommercial

29+ yrs

Experience

3000+

Projects

80 km

Service radius

11-50

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Robco Electric

Locally owned Las Vegas solar and electrical contractor since 1997 with over 3,000 satisfied solar customers

Las Vegas, Nevada 89139

Las Vegas, Nevada 89139

Services Offered

Solar InstallationBattery StorageMaintenanceSolar Designelectrical_services

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

BBB AccreditedNV Master Electrician

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Las Vegas, NevadaHenderson, NevadaNorth Las Vegas, NevadaSummerlin, NevadaBoulder City, Nevada

Customer Reviews

No reviews yet. Be the first to review Robco Electric!

Write a Review

Frequently Asked Questions

How do I get a quote from Robco Electric?

You can request a quote through the form on this page or contact Robco Electric directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Robco Electric serve?

Robco Electric is based in Las Vegas and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Robco Electric hold?

This profile lists the following reported certifications: BBB Accredited, NV Master Electrician. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Robco Electric offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Robco Electric for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Robco Electric for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Robco Electric handle permits and paperwork?

The exact scope is not verified on this profile. Ask Robco Electric which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded1997
Employees11-50
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Robco Electric

Send your project details to request follow-up from Robco Electric. Response timing and consultation terms are set by the company.

For Robco Electric

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
R

Robco Electric

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.