R

REPOWER OC in Long Beach

Long Beach, California·Solar Installation
ResidentialCommercial

11+ yrs

Experience

80 km

Service radius

1-10

Employees

Profile information

83%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About REPOWER OC

Published directory profile for REPOWER OC in Long Beach. Verify services, credentials, ratings, and references directly with their original sources.

Long Beach, California 92626

Long Beach, California 92626

Services Offered

Solar InstallationSolar Design

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

C-46 Solar Contractor License

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Long Beach, CaliforniaCosta Mesa, CaliforniaIrvine, CaliforniaHuntington Beach, CaliforniaAnaheim, CaliforniaSanta Ana, California

Customer Reviews

No reviews yet. Be the first to review REPOWER OC!

Write a Review

Frequently Asked Questions

How do I get a quote from REPOWER OC?

You can request a quote through the form on this page or contact REPOWER OC directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does REPOWER OC serve?

REPOWER OC is based in Long Beach and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does REPOWER OC hold?

This profile lists the following reported certifications: C-46 Solar Contractor License. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does REPOWER OC offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask REPOWER OC for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask REPOWER OC for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does REPOWER OC handle permits and paperwork?

The exact scope is not verified on this profile. Ask REPOWER OC which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

Founded2015
Employees1-10
Profile StatusUnclaimed
Profile Complete83%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from REPOWER OC

Send your project details to request follow-up from REPOWER OC. Response timing and consultation terms are set by the company.

For REPOWER OC

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
R

REPOWER OC

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.