R

Renewable Energy Design Group in Durham

Durham, North Carolina·Solar Installation
ResidentialCommercial

14+ yrs

Experience

200 km

Service radius

11-50

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Renewable Energy Design Group

Leading solar contractor in NC and SC since 2012 — residential, commercial, and agricultural solar installations

Durham, North Carolina 27023

Durham, North Carolina 27023

Services Offered

Solar InstallationBattery StorageMaintenance

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

BBB A+NC General Contractor LicenseNC Electrical Contractor License

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Durham, North CarolinaRaleigh, North CarolinaWinston-Salem, North CarolinaGreensboro, North CarolinaCharlotte, North Carolina

Customer Reviews

No reviews yet. Be the first to review Renewable Energy Design Group!

Write a Review

Frequently Asked Questions

How do I get a quote from Renewable Energy Design Group?

You can request a quote through the form on this page or contact Renewable Energy Design Group directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Renewable Energy Design Group serve?

Renewable Energy Design Group is based in Durham and serves within a 200 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Renewable Energy Design Group hold?

This profile lists the following reported certifications: BBB A+, NC General Contractor License, NC Electrical Contractor License. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Renewable Energy Design Group offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Renewable Energy Design Group for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Renewable Energy Design Group for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Renewable Energy Design Group handle permits and paperwork?

The exact scope is not verified on this profile. Ask Renewable Energy Design Group which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2012
Employees11-50
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Renewable Energy Design Group

Send your project details to request follow-up from Renewable Energy Design Group. Response timing and consultation terms are set by the company.

For Renewable Energy Design Group

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
R

Renewable Energy Design Group

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.