R

Region Solar + Electric in Sarasota

Sarasota, Florida·Solar Installation
ResidentialCommercialIndustrial

19+ yrs

Experience

120 km

Service radius

2-10

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Region Solar + Electric

Family-run solar and electrical contractor serving Sarasota and Southwest Florida since 2007

Sarasota, Florida 34234

Sarasota, Florida 34234

Services Offered

Solar InstallationBattery StorageEV ChargingMaintenance

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

State Certified Solar ContractorState Certified Electrical ContractorBBB Accredited

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Sarasota, FloridaBradenton, FloridaVenice, FloridaTampa, FloridaSt. Petersburg, FloridaFort Myers, FloridaNaples, Florida

Customer Reviews

No reviews yet. Be the first to review Region Solar + Electric!

Write a Review

Frequently Asked Questions

How do I get a quote from Region Solar + Electric?

You can request a quote through the form on this page or contact Region Solar + Electric directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Region Solar + Electric serve?

Region Solar + Electric is based in Sarasota and serves within a 120 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Region Solar + Electric hold?

This profile lists the following reported certifications: State Certified Solar Contractor, State Certified Electrical Contractor, BBB Accredited. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Region Solar + Electric offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Region Solar + Electric for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Region Solar + Electric for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Region Solar + Electric handle permits and paperwork?

The exact scope is not verified on this profile. Ask Region Solar + Electric which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2007
Employees2-10
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Region Solar + Electric

Send your project details to request follow-up from Region Solar + Electric. Response timing and consultation terms are set by the company.

For Region Solar + Electric

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
R

Region Solar + Electric

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.