P

Puget Sound Solar in Tacoma

Tacoma, Washington·Solar Installation
ResidentialCommercial

25+ yrs

Experience

100 km

Service radius

11-50

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Puget Sound Solar

Family-owned solar installer since 2001 that installed Seattle's first net-metered solar system

Tacoma, Washington 98144

Tacoma, Washington 98144

Services Offered

Solar InstallationBattery StorageEV ChargingMaintenance

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Tacoma, WashingtonSeattle, WashingtonOlympia, WashingtonBellevue, WashingtonEverett, Washington

Customer Reviews

No reviews yet. Be the first to review Puget Sound Solar!

Write a Review

Frequently Asked Questions

How do I get a quote from Puget Sound Solar?

You can request a quote through the form on this page or contact Puget Sound Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Puget Sound Solar serve?

Puget Sound Solar is based in Tacoma and serves within a 100 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Puget Sound Solar hold?

This profile does not list independently verified certifications. Ask Puget Sound Solar for current license, insurance, and credential details, then confirm them with the relevant authority.

What warranty does Puget Sound Solar offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Puget Sound Solar for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Puget Sound Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Puget Sound Solar handle permits and paperwork?

The exact scope is not verified on this profile. Ask Puget Sound Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2001
Employees11-50
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Puget Sound Solar

Send your project details to request follow-up from Puget Sound Solar. Response timing and consultation terms are set by the company.

For Puget Sound Solar

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
P

Puget Sound Solar

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.