P

Premier Improvements Solar in Hartford

Hartford, Connecticut·Solar Installation
Residential

6+ yrs

Experience

1000+

Projects

80 km

Service radius

11-50

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Premier Improvements Solar

Veteran-owned Connecticut solar installer with over 1,000 installations and SunPower dealer status

Hartford, Connecticut 06107

Hartford, Connecticut 06107

Services Offered

Solar InstallationBattery StorageSolar DesignEnergy AuditGrid Connection

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

SunPower DealerOwens Corning Dealer

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

SunPower

Inverters

SunPowerEnphase

Batteries

Tesla PowerwallFranklinWH

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

West Hartford, ConnecticutHartford, ConnecticutNew Britain, ConnecticutFarmington, ConnecticutGlastonbury, ConnecticutAvon, ConnecticutSimsbury, ConnecticutManchester, Connecticut

Customer Reviews

No reviews yet. Be the first to review Premier Improvements Solar!

Write a Review

Frequently Asked Questions

How do I get a quote from Premier Improvements Solar?

You can request a quote through the form on this page or contact Premier Improvements Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Premier Improvements Solar serve?

Premier Improvements Solar is based in Hartford and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Premier Improvements Solar hold?

This profile lists the following reported certifications: SunPower Dealer, Owens Corning Dealer. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Premier Improvements Solar offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Premier Improvements Solar for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Premier Improvements Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Premier Improvements Solar handle permits and paperwork?

The exact scope is not verified on this profile. Ask Premier Improvements Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

Founded2020
Employees11-50
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Premier Improvements Solar

Send your project details to request follow-up from Premier Improvements Solar. Response timing and consultation terms are set by the company.

For Premier Improvements Solar

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
P

Premier Improvements Solar

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.