Positive Energy Solar in Santa Fe
29+ yrs
Experience
3500+
Projects
100 km
Service radius
51-100
Employees
Profile information
About Positive Energy Solar
Employee-owned B Corp solar installer serving Santa Fe since 1997 with 3,500+ installations across New Mexico
Santa Fe, New Mexico 87507
Santa Fe, New Mexico 87507
Services Offered
Reported Certifications
These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.
Reported Equipment Brands
Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.
Panels
Inverters
Batteries
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
25yr
Inverter Warranty
30yr
Installation Warranty
Questions to Ask About Installation
Initial Consultation
Ask whether a site assessment is offered, what it covers, and whether it has a fee.
System Design
Request a design showing the proposed equipment, layout, assumptions, and itemized costs.
Permitting & Approval
Confirm who handles permits, inspections, and utility interconnection, and which fees are included.
Installation
Verify the installation team’s licenses, relevant certifications, and insurance.
Commissioning & Handover
Confirm the testing records, monitoring access, warranty registration, and support included in the handover.
Service Areas
Customer Reviews
No reviews yet. Be the first to review Positive Energy Solar!
Frequently Asked Questions
How do I get a quote from Positive Energy Solar?
You can request a quote through the form on this page or contact Positive Energy Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does Positive Energy Solar serve?
Positive Energy Solar is based in Santa Fe and serves within a 100 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does Positive Energy Solar hold?
This profile lists the following reported certifications: NABCEP Certified, Certified B Corporation. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.
What warranty does Positive Energy Solar offer?
This profile reports 25-year panel coverage and 30-year workmanship coverage. Ask Positive Energy Solar for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask Positive Energy Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does Positive Energy Solar handle permits and paperwork?
The exact scope is not verified on this profile. Ask Positive Energy Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Contact Information
Request a QuoteBusiness Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Request a Quote from Positive Energy Solar
Send your project details to request follow-up from Positive Energy Solar. Response timing and consultation terms are set by the company.
For Positive Energy Solar
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
Positive Energy Solar