P

Positive Energy Solar in Albuquerque

Albuquerque, New Mexico·Solar Installation
ResidentialCommercial

29+ yrs

Experience

5000+

Projects

150 km

Service radius

101-200

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Positive Energy Solar

Employee-owned B-Corp solar installer with over 5,000 installations across New Mexico since 1997

Albuquerque, New Mexico 87107

Albuquerque, New Mexico 87107

Services Offered

Solar InstallationBattery StorageEV ChargingMaintenanceMonitoringCommercial SolarEnergy Audit

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

NABCEPB-Corp CertifiedSunPower Master Dealer

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

SunPower

Inverters

Enphase

Batteries

Tesla Powerwall

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Albuquerque, New MexicoSanta Fe, New MexicoRio Rancho, New MexicoCorrales, New MexicoLos Lunas, New MexicoTijeras, New MexicoEdgewood, New MexicoPlacitas, New MexicoSandia Park, New Mexico

Customer Reviews

No reviews yet. Be the first to review Positive Energy Solar!

Write a Review

Frequently Asked Questions

How do I get a quote from Positive Energy Solar?

You can request a quote through the form on this page or contact Positive Energy Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Positive Energy Solar serve?

Positive Energy Solar is based in Albuquerque and serves within a 150 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Positive Energy Solar hold?

This profile lists the following reported certifications: NABCEP, B-Corp Certified, SunPower Master Dealer. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Positive Energy Solar offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Positive Energy Solar for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Positive Energy Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Positive Energy Solar handle permits and paperwork?

The exact scope is not verified on this profile. Ask Positive Energy Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded1997
Employees101-200
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Positive Energy Solar

Send your project details to request follow-up from Positive Energy Solar. Response timing and consultation terms are set by the company.

For Positive Energy Solar

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
P

Positive Energy Solar

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.