Plannet Solar in Wilmington
4+ yrs
Experience
60 km
Service radius
1-10
Employees
Profile information
About Plannet Solar
Wilmington-based solar installer with 15 years of field experience in residential and commercial systems
Wilmington, Delaware 19806
Wilmington, Delaware 19806
Services Offered
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
25yr
Inverter Warranty
10yr
Installation Warranty
Questions to Ask About Installation
Initial Consultation
Ask whether a site assessment is offered, what it covers, and whether it has a fee.
System Design
Request a design showing the proposed equipment, layout, assumptions, and itemized costs.
Permitting & Approval
Confirm who handles permits, inspections, and utility interconnection, and which fees are included.
Installation
Verify the installation team’s licenses, relevant certifications, and insurance.
Commissioning & Handover
Confirm the testing records, monitoring access, warranty registration, and support included in the handover.
Service Areas
Customer Reviews
No reviews yet. Be the first to review Plannet Solar!
Frequently Asked Questions
How do I get a quote from Plannet Solar?
You can request a quote through the form on this page or contact Plannet Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does Plannet Solar serve?
Plannet Solar is based in Wilmington and serves within a 60 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does Plannet Solar hold?
This profile does not list independently verified certifications. Ask Plannet Solar for current license, insurance, and credential details, then confirm them with the relevant authority.
What warranty does Plannet Solar offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Plannet Solar for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask Plannet Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does Plannet Solar handle permits and paperwork?
The exact scope is not verified on this profile. Ask Plannet Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Business Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Request a Quote from Plannet Solar
Send your project details to request follow-up from Plannet Solar. Response timing and consultation terms are set by the company.
For Plannet Solar
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
Plannet Solar