P

Pittsburgh Solar in Pittsburgh

Pittsburgh, Pennsylvania·Solar Installation
Residential

6+ yrs

Experience

80 km

Service radius

1-10

Employees

Profile information

83%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About Pittsburgh Solar

Transparent, cost-conscious Pittsburgh solar installer charging labor and materials at cost to help homeowners get the right system for their needs

Pittsburgh, Pennsylvania 15237

Pittsburgh, Pennsylvania 15237

Services Offered

Solar InstallationBattery StorageSolar DesignGrid ConnectionMaintenance

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

Tier-1 Solar Panels

Inverters

String InvertersMicroinverters

Batteries

Battery Backup

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

5yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Pittsburgh, PennsylvaniaNorth Hills, PennsylvaniaRoss Township, PennsylvaniaMcCandless, PennsylvaniaWexford, PennsylvaniaAllison Park, Pennsylvania

Customer Reviews

No reviews yet. Be the first to review Pittsburgh Solar!

Write a Review

Frequently Asked Questions

How do I get a quote from Pittsburgh Solar?

You can request a quote through the form on this page or contact Pittsburgh Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Pittsburgh Solar serve?

Pittsburgh Solar is based in Pittsburgh and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Pittsburgh Solar hold?

This profile does not list independently verified certifications. Ask Pittsburgh Solar for current license, insurance, and credential details, then confirm them with the relevant authority.

What warranty does Pittsburgh Solar offer?

This profile reports 25-year panel coverage and 5-year workmanship coverage. Ask Pittsburgh Solar for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Pittsburgh Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Pittsburgh Solar handle permits and paperwork?

The exact scope is not verified on this profile. Ask Pittsburgh Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

Founded2020
Employees1-10
Profile StatusUnclaimed
Profile Complete83%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Pittsburgh Solar

Send your project details to request follow-up from Pittsburgh Solar. Response timing and consultation terms are set by the company.

For Pittsburgh Solar

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
P

Pittsburgh Solar

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.