P

Photon Brothers in Fort Collins

Fort Collins, Colorado·Solar Installation
ResidentialCommercial

10+ yrs

Experience

1500+

Projects

200 km

Service radius

51-200

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Photon Brothers

Colorado solar specialists and Tesla Powerwall Certified Installer with over 1,500 residential installations statewide

Fort Collins, Colorado 80021

Fort Collins, Colorado 80021

Services Offered

Solar InstallationBattery StorageEV ChargingSolar DesignMaintenance

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

Tesla Powerwall Certified InstallerBBB AccreditedColorado Contractor License

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Batteries

Tesla Powerwall

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Fort Collins, ColoradoDenver, ColoradoBroomfield, ColoradoBoulder, ColoradoLoveland, ColoradoColorado Springs, Colorado

Customer Reviews

No reviews yet. Be the first to review Photon Brothers!

Write a Review

Frequently Asked Questions

How do I get a quote from Photon Brothers?

You can request a quote through the form on this page or contact Photon Brothers directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Photon Brothers serve?

Photon Brothers is based in Fort Collins and serves within a 200 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Photon Brothers hold?

This profile lists the following reported certifications: Tesla Powerwall Certified Installer, BBB Accredited, Colorado Contractor License. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Photon Brothers offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Photon Brothers for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Photon Brothers for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Photon Brothers handle permits and paperwork?

The exact scope is not verified on this profile. Ask Photon Brothers which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2016
Employees51-200
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Photon Brothers

Send your project details to request follow-up from Photon Brothers. Response timing and consultation terms are set by the company.

For Photon Brothers

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
P

Photon Brothers

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.