Photon Brothers in Denver
13+ yrs
Experience
80 km
Service radius
11-50
Employees
Profile information
About Photon Brothers
NABCEP-certified solar specialists serving Denver and the Front Range with premium panels and batteries
Denver, Colorado 80021
Denver, Colorado 80021
Services Offered
Reported Certifications
These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.
Reported Equipment Brands
Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.
Panels
Inverters
Batteries
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
25yr
Inverter Warranty
10yr
Installation Warranty
Questions to Ask About Installation
Initial Consultation
Ask whether a site assessment is offered, what it covers, and whether it has a fee.
System Design
Request a design showing the proposed equipment, layout, assumptions, and itemized costs.
Permitting & Approval
Confirm who handles permits, inspections, and utility interconnection, and which fees are included.
Installation
Verify the installation team’s licenses, relevant certifications, and insurance.
Commissioning & Handover
Confirm the testing records, monitoring access, warranty registration, and support included in the handover.
Service Areas
Customer Reviews
No reviews yet. Be the first to review Photon Brothers!
Frequently Asked Questions
How do I get a quote from Photon Brothers?
You can request a quote through the form on this page or contact Photon Brothers directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does Photon Brothers serve?
Photon Brothers is based in Denver and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does Photon Brothers hold?
This profile lists the following reported certifications: NABCEP, SunPower Elite. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.
What warranty does Photon Brothers offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Photon Brothers for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask Photon Brothers for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does Photon Brothers handle permits and paperwork?
The exact scope is not verified on this profile. Ask Photon Brothers which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Business Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Request a Quote from Photon Brothers
Send your project details to request follow-up from Photon Brothers. Response timing and consultation terms are set by the company.
For Photon Brothers
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
Photon Brothers