PES Solar in Orlando
29+ yrs
Experience
120 km
Service radius
51-200
Employees
Profile information
About PES Solar
Family-owned solar installer serving Florida since 1997 with over one million panels installed
Orlando, Florida 32750
Orlando, Florida 32750
Services Offered
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
12yr
Inverter Warranty
10yr
Installation Warranty
Questions to Ask About Installation
Initial Consultation
Ask whether a site assessment is offered, what it covers, and whether it has a fee.
System Design
Request a design showing the proposed equipment, layout, assumptions, and itemized costs.
Permitting & Approval
Confirm who handles permits, inspections, and utility interconnection, and which fees are included.
Installation
Verify the installation team’s licenses, relevant certifications, and insurance.
Commissioning & Handover
Confirm the testing records, monitoring access, warranty registration, and support included in the handover.
Service Areas
Customer Reviews
No reviews yet. Be the first to review PES Solar!
Frequently Asked Questions
How do I get a quote from PES Solar?
You can request a quote through the form on this page or contact PES Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does PES Solar serve?
PES Solar is based in Orlando and serves within a 120 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does PES Solar hold?
This profile does not list independently verified certifications. Ask PES Solar for current license, insurance, and credential details, then confirm them with the relevant authority.
What warranty does PES Solar offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask PES Solar for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask PES Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does PES Solar handle permits and paperwork?
The exact scope is not verified on this profile. Ask PES Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Contact Information
Request a QuoteBusiness Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Request a Quote from PES Solar
Send your project details to request follow-up from PES Solar. Response timing and consultation terms are set by the company.
For PES Solar
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
PES Solar